Background


Of the many options and kits available we have chosen the South African Birkin - a kit which faithfully reproduces the beauty of Colin Chapman's original car and which you build up with component parts from the factory, adding in your choice of engine and transmission.



This holds true to the tradition of garden shed mechanics without requiring quite the level of welding skill, or CAD programming, that some of the amazing, home built clubman cars require. Or at least we hope not, as neither of us have done anything like this before.....



Sunday, January 23, 2011

Water Rail

We have finally added the water rail which is from Raceline. It's a lovely bit of engineering, with plenty of take-offs for temp senders and heaters. Due to the Birkin headers being a bit tall, it does need some modification to fit over the exhaust manifold of number one cylinder.
This was achieved with the angle grinder and a metal file. Rob from Meridian welded a plate over the resulting gap and once a few troublesome bosses were ground off the engine block the rail fitted as nature intended. It looks great!

Saturday, January 22, 2011

Carbon canister and fuel reg

 We've used a Toyota MR2 carbon canister as it's very small and fits nicely in between the tank and the side wall of the chassis. The bracket was fashioned from 2 hose clips riveted to a strip of steel which had been bent to suit the profile of the canister. The canister was wrapped in two strips of sticky foam, the clips tightened and the whole thing was bolted to the car with minimal stress. Which was a first......

At the same time we attached a fuel filter and pressure regulator to the back wall of the cockpit, as our pump doesn't have one inbuilt. They are pretty standard items and again didn't require any Anglo-Saxon language. We'll tidy up the lines as we go along as I think they will need protecting from abrassive contacts - for now though we'll just cable tie them out of the way

Wednesday, November 3, 2010

Windscreen mounts


We recently popped the scuttle on to drill the windscreen mount holes. For some reason this was a job we'd really been putting off. Something to do with a complete lack of hand eye co-ordination and the fact that now that parts are painted we live in fear of scratches and dings (despite the fact that when we first drive it its bound to get stone chips everywhere!)

However, by using very small pilot drills bits for accuracy and a pair of calipers to check the distance between the holes on the mounting bracket, it all went without much loss of life. Drilling into your pride and joy still feels very wrong though - similar to the dashboard experience - and we were glad when it was all over.

Gauges


As with all builds we've had a bit of a hiatus while we wait for bits and pieces to turn up. Since the gauges arrived we decided to slot them in along with a few dash board lights.

The gauges are Stack items, which are black faced and therefore fairly traditional, but they're also backlit, which looks pretty cool.
As suspected not all the sizes matched up. For the dash light this was easy to fix as it just involved a step drill, but the tacho was a different matter as the hole needed to be shifted right as well as being enlarged. An old school compass, a bit of card, some masking tape and a metal file later and all was serene. It's not very relaxing atttacking your carbon fibre-like dash board and I was glad when it was over!

Sunday, September 19, 2010

Exhaust headers

Remember the hole we cut in the body work? Well, today we fitted the exhaust headers and we've been relieved to find that it is indeed in the right place to allow them to exit.

The cardboard template was spot on and we are very pleased with the result.

We also fitted the drive shaft which was a simple process and at last the sum of scattered parts is starting to resemble a real car.

Engine in!

Another big day yesterday. The front of the car was lifted and the engine/ and transmission was rolled underneath. It was surprisingly easy with just two people. The front of the car was lowered by increments and the engine nudged forward and back to clear each potential obstruction, and in the end the process passed relatively free of Anglo-Saxon language. Finally, the gear box needed to be lifted with a trolley jack to slide into the tunnel and that was it.
I wish I could say the same for actually attaching the engine to the chassis. The bolts were very difficult to align and changes in the attitude of the engine when hanging from the crane were difficult to achieve accurately. After almost crossing one set of threads we decided food and wine were more important and left it for the night to come back fresh the next day for a final assault.

Saturday, August 28, 2010

Wheels!

A big day today. With the help of Brenton from Meridian, who very kindly lent a hand, we lifted the car off the build table and fitted the wheels. Once we got over the excitement of pushing the chassis up and down the garage we raised it onto axle stands so we can start fitting gauges and working on the ancillaries.

 The more observant will notice the tyres are not all fitted correctly - we only spotted this when we got them back from balancing. However the garage that did it are more than happy to rectify the situation and it won't be long before the treads all face the right way.